Building permit · Permit issued date · Job value (declared value) · Contractor of record · Contractor license number · Owner-builder permit · Trade · Re-roof · New construction · Unincorporated Miami-Dade · Folio number and municipality code · County-issued permit inside a city · Notice of commencement (NOC) · Notice to owner (NTO) · First furnishing · Owner designee · Construction lender · Surety and payment bond · Claim of lien · Official Records · Invitation to bid (ITB)
Florida construction glossary
- Building permit
- The approval a building department issues before work starts. It names the contractor, the kind of work and a declared value.
- Why it matters: A new permit means a job is starting: the contractor is buying materials and booking subs now.
- In our data: Miami-Dade (county-issued) permits with a trade, Oct 27–Nov 2: 861.
- Permit issued date
- The day the permit was issued. Our CSV shows it as filed_date, next to first_seen_date, the day we first collected it.
- Why it matters: The gap between the two tells you how fresh a lead is.
- Job value (declared value)
- The estimated cost of the work, as declared on the permit application. A sub-permit (electrical, plumbing and the like, issued under a main permit) usually repeats the main permit's value, so we count each job's value once.
- Why it matters: It sizes the job, and so the material order.
- In our data: Median declared value of Miami-Dade permits with a trade, counted once per job, Oct 27–Nov 2: $14,536.
- Contractor of record
- The licensed company that pulled the permit and is responsible for the work.
- Why it matters: Your prospect: a contractor who pulls many permits is worth winning as a repeat customer.
- In our data: 622 different contractors on those Miami-Dade permits.
- Contractor license number
- The Florida license (DBPR) the permit was pulled under. A number starting with C (CGC, CCC ...) is a state-certified contractor who can work anywhere in Florida; one starting with R (RG, RC ...) is registered, valid only where the contractor holds a local license.
- Why it matters: It tells you the contractor's trade and how widely they can work. Our feed does not include license numbers yet.
- Owner-builder permit
- A permit pulled by the property owner, who acts as their own contractor (the contractor field reads "OWNER").
- Why it matters: Usually a homeowner, not a business you can sell to: we remove these.
- In our data: Our last Miami-Dade collection removed 8 owner-builder permits or contractors with no company marker.
- Trade
- Our sorting of each permit into the kind of work (roofing, HVAC, pool, windows and doors ...) by fixed keyword rules on the permit type and description.
- Why it matters: You receive only your trades.
- Data pages by trade
- Re-roof
- A permit to replace an existing roof.
- Why it matters: Big material orders on a short timeline.
- In our data: Miami-Dade roofing permits, Oct 27–Nov 2: 189.
- New construction
- A permit for a new building: a house, apartments, a commercial building, a pool and similar.
- Why it matters: The longest material lists, starting with the foundation.
- In our data: Tallahassee–Leon publishes only active new-construction permits: 7 permits held so far.
- Unincorporated Miami-Dade
- The parts of Miami-Dade County outside every city. The county's own building department issues permits there.
- Why it matters: Most of the permits in Miami-Dade's dataset are here; cities with their own building departments issue their own permits, which are not in it (the City of Miami's are a separate area here).
- In our data: 88% of the 870 Miami-Dade permits we hold are on unincorporated parcels.
- Folio number and municipality code
- The 13-digit number Miami-Dade gives each parcel. Its first two digits are the municipality code: 30 means unincorporated, 01 the City of Miami, 35 Doral, and so on (Miami-Dade Property Appraiser).
- Why it matters: We use the code to show where a permit really is; the folio itself is not kept.
- County-issued permit inside a city
- A permit issued by Miami-Dade County's building department for a property inside a city.
- Why it matters: A handful of permits in cities do appear; most of a city's permits come from its own department.
- In our data: The cities with the most, among the permits we hold: Miami 25, Miami Beach 11, Aventura 8, Sunny Isles Beach 7, Doral 6.
- Notice of commencement (NOC)
- A form the owner records in the county's Official Records before work starts (§713.13, Florida Statutes), naming the owner, contractor, any surety and lender, and who receives notices.
- Why it matters: It is where lien services find the parties for a notice to owner. We do not deliver notices of commencement yet.
- Florida notice of commencement and notice to owner guide
- Notice to owner (NTO)
- The notice a subcontractor or supplier without a direct contract with the owner serves to protect its lien rights: before starting, or within 45 days of first furnishing (§713.06).
- Why it matters: Miss the deadline and the lien right can be lost.
- The 45-day calculator
- First furnishing
- The first day a supplier or subcontractor delivers labor, services or materials to the job.
- Why it matters: The 45-day notice-to-owner clock counts from it.
- Owner designee
- A person the owner names in the notice of commencement to receive a copy of notices.
- Why it matters: Notices go to them as well as the owner.
- Construction lender
- The lender financing the job, named in the notice of commencement.
- Why it matters: It also receives the notice to owner.
- Surety and payment bond
- A bond from a surety company that guarantees subcontractors and suppliers get paid; when one exists, claims go against the bond.
- Why it matters: A bonded job changes how you protect payment.
- Claim of lien
- The lien a contractor, sub or supplier records against the property when unpaid: no later than 90 days after its final furnishing (§713.08).
- Why it matters: The last step to secure payment on a private job.
- Official Records
- The county Clerk's public record of recorded documents (deeds, mortgages, notices of commencement). Searches usually need a grantor or grantee name or an instrument number.
- Why it matters: Hard to search when you do not know the owner's name.
- Invitation to bid (ITB)
- A general contractor's request for subcontractor prices on a project.
- Why it matters: Seeing permits early lets a sub get on the bid list before the ITB goes out.
Definitions are general information, not legal advice. Statute references are to chapter 713 of the Florida Statutes.